History in Structure

Corporation Bridge

A Grade II Listed Building in Grimsby, North East Lincolnshire

Cororation Bridge, Grimsby

Uploader's Comments

An Electrically Powered Scherzer Rolling Lift Road Bridge built 1925 by Alfred C. Gardner Docks Engineer to the London North Eastern Railway. Contractor Sir William Arrol & Co, of Glasgow, for the Grimsby Corporation, to replace an earlier Swing Bridge. A Grade II Listed Building.

Uploaded by riffraff1 on 24 September 2010

http://www.flickr.com/photos/riffraff1/4300489524/

Photo ID: 3375
Building ID: 101379432
Report this photo

Photo Navigator

BritishListedBuildings.co.uk is an independent online resource and is not associated with any government department. All government data published here is used under licence. Please do not contact BritishListedBuildings.co.uk for any queries related to any individual listed building, planning permission related to listed buildings or the listing process itself.

British Listed Buildings is a Good Stuff website.