A much altered structure. The building was begun on a stone plinth. The carriage arch was filled in with slender C18 bricks, apparently not long after it was built. The flat topped doorway within the carriage arch has been blocked with larger, C19 bricks which are still standard today. The lean to on the right is built of C19 bricks, but the curved headed doorway in it has been blocked with recycled C18 bricks. The wall projecting from the left side and the replacement carriage entrance are both C18, while the upper courses and coping above the wooden doors are C19. (Photo Apr 2014).
Uploaded by Andrew H Jackson on 13 July 2018
Photo ID: 213723
Building ID: 101230935
Report this photo