Latitude: 51.5035 / 51°30'12"N
Longitude: -3.5694 / 3°34'9"W
OS Eastings: 291168
OS Northings: 179447
OS Grid: SS911794
Mapcode National: GBR HD.JJX3
Mapcode Global: VH5HK.2GVT
Plus Code: 9C3RGC3J+96
Entry Name: West Skeal Overbridge
Listing Date: 5 April 2016
Grade: II
Source: Cadw
Source ID: 87701
ID on this website: 300087701
Location: On Coychurch Road, near to its junction with Tremains Road.
County: Bridgend
Community: Bridgend (Pen-y-bont ar Ogwr)
Community: Bridgend
Built-Up Area: Bridgend
Traditional County: Glamorgan
Constructed as part of the development of the South Wales Railway (SWR) from 1844 by the Great Western Railway (GWR). The Chief Engineer of the GWR Isambard Kingdom Brunel was appointed as engineer for the SWR. No direct evidence exists that shows that Brunel was directly responsible for the engineering of the line but is probable that he had direct influence on the laying out of the line and the design of the structures along it.
Initially the SWR was connected to the Cheltenham branch of the GWR across the Severn estuary, to Chepstow and then Newport, Cardiff, Bridgend, Neath and Swansea, eventually to Carmarthen, Fishguard and Pembroke. The route was laid out to follow the largely level coastal plain, avoiding the difficult contours of the South Wales Valleys but still requiring substantial engineering works along the line, notably at Neath (the Neath Abbey Viaduct across the River Clydach) and Landore (where a timber viaduct was constructed). Brunel would have been responsible for designing or supervising these works.
Work on the construction of the SWR began in 1846 with the line from Chepstow to Swansea opening in 1850. With the construction of the Wye Bridge in 1852 the South Wales Railway was connected to the rest of the railway network via Gloucester. The Severn Tunnel was constructed in 1886 taking the line on the more direct route from Severn Tunnel Junction to Bristol. To further improve journey times the line from Newport to Cardiff was quadrupled in 1941, removing many of the original line structures. The line west of Cardiff has not been quadrupled.
West Skeal Overbridge survives largely intact as one of the original structures of the SWR.
Railway bridge, single span masonry overbridge with projecting wingwalls. Constructed from coursed and squared rock faced sandstone with rusticated voussoirs. Parapet of uneven courses with partial replacement of the cappings and rebuilding to the high mileage side.
Included for its special architectural interest despite later rebuilding of the parapet as a well preserved example of a mid C19 railway bridge, one of the original structures of the South Wales Railway.
It is also of special historic interest for being associated with the renowned Victorian engineer IK Brunel, forming part of a remarkably complete body of work by him and a significant contribution to the engineering heritage of the UK. It forms part of the growth of the railway network in the age of ‘Railway Mania’ in the mid C19, a period when long distance travel was revolutionised and South Wales became linked much closer to England, leading in part to the industrial and urban boom of Victorian South Wales.
External links are from the relevant listing authority and, where applicable, Wikidata. Wikidata IDs may be related buildings as well as this specific building. If you want to add or update a link, you will need to do so by editing the Wikidata entry.
Other nearby listed buildings